Aminata gave me a few changes to make on my first building. The chimney needed to have more depth, I needed to add wires for the aerials above the house, the balcony needed to be smaller approx 20 cm out and I needed to add stylised french railings.
Saturday, 2 February 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment